---
title: FSMA 204 Traceability Plan: Structure, Examples and Template
url: https://www.fsma.us.com/traceability-plan/
description: The six sections a written traceability plan has to contain, worked examples for three operation types, and an editable Word template you can download.
publisher: FSMA 204 Resource Center
---

## On this page

- [What the plan is for](https://www.fsma.us.com/traceability-plan/#what)
- [The six sections](https://www.fsma.us.com/traceability-plan/#sections)
- [Writing section 1 in practice](https://www.fsma.us.com/traceability-plan/#section-one)
- [Who writes it and who signs it](https://www.fsma.us.com/traceability-plan/#signing)
- [Three worked examples](https://www.fsma.us.com/traceability-plan/#examples)
- [Where plans fall down](https://www.fsma.us.com/traceability-plan/#mistakes)
- [Download the template](https://www.fsma.us.com/traceability-plan/#template)
- [Frequently asked questions](https://www.fsma.us.com/traceability-plan/#faq)

Guide · FSMA 204

# The written traceability plan: structure, examples and template

Every business covered by the Food Traceability Rule has to keep a written
traceability plan. It is the shortest document the rule asks for, the first one an
investigator reads, and the one that decides how the rest of the conversation goes.

## What the plan is for

The plan is not the records. The records are the lot-level data you capture every day;
the plan is the document that explains how you capture them. An investigator reads it to
understand your operation before asking for anything, and an auditor reads it to decide
which questions to ask.

Because it is short, it tends to get treated as a formality. That is a missed opportunity.
Writing it honestly forces a plant to answer questions that are usually unowned: who
assigns lot codes, where receiving records physically live, what happens when the person
who runs the export is on holiday. Most of the value of the exercise is in discovering
that one of those answers does not exist yet.

Keep it to a handful of pages. A plan that describes your operation accurately in four
pages is worth more than a forty-page quality manual that describes an operation you no
longer run.

## The six sections

The rule sets out what the plan has to contain. Organised for use, it comes to six
sections.

| Section | What it has to establish |
|---|---|
| 1. Recordkeeping procedures | How you maintain the required records: which system or form captures each critical tracking event, where the records are stored, in what format, and how they are kept for two years. |
| 2. Identifying covered foods | How you determine which of the foods you handle are on the Food Traceability List, and where that determination is recorded and reviewed. |
| 3. Assigning traceability lot codes | How lot codes are assigned when you are the one who assigns them: the format, the point in the process, and the system that generates them. |
| 4. Point of contact | A named person, with a role and contact details, for questions about the plan and the records. |
| 5. Farm map | For farms growing or raising listed foods: a map or description of the growing areas, including geographic coordinates. |
| 6. Version control | The current version, its date, and the record of earlier versions. Superseded versions are kept for two years. |

Sections 1 to 4 apply to everyone covered. Section 5 applies to farms. Section 6 is the
practical consequence of the retention requirement: you have to be able to show what your
plan said at the time the records were created, not only what it says today.

## Writing section 1 in practice

Section 1 — the recordkeeping procedures — is where plans are won or lost.
The other five sections are largely factual. This one has to describe a real data flow, and
a vague description here is what produces a follow-up visit.

The reliable structure is one short block per critical tracking event that occurs in your
operation. For each event, state four things:

- **What triggers the record.** “A goods receipt is posted when the
trailer is unloaded and the pallet labels are scanned” is a trigger. “Records
are maintained at receiving” is not.

- **Which system or form holds it,** named specifically, including the
module or the form number. If it is a paper form that is later keyed in, say both, and
say which one is the record of truth.

- **Which key data elements it captures,** listed. This is the part that
lets a reader check your coverage without reading your database.

- **How it is retained for two years** — backup, archive, retention
setting — and who is responsible.

Then add one paragraph that does not appear in the regulation and that experienced
readers look for anyway: how the records from those systems are joined into a single file
for a given lot code. Name the export, the report or the query. If the answer today is
“somebody assembles it manually”, write that, and write how long it took the
last time you did it. An honest plan that states a known limitation reads better than a
confident one that collapses under the first question.

Two details are worth spelling out because they are the ones most often missing. First,
the link between inputs and outputs at transformation: say explicitly where that link is
stored, because it is the join that makes a traceback possible. Second, what happens to
the lot code when product is repacked or relabeled: say whether the original code is
carried forward and how.

Keep the tense honest. The plan describes what happens now. Improvements that are funded
but not yet live belong in a separate roadmap, not in the plan, because a plan that
describes a future state is a plan that does not match the records an investigator is
holding.

## Who writes it and who signs it

The rule requires the plan to be written and kept current. It does not prescribe a job
title. In practice the plan works when it is drafted by whoever actually knows where the
records are — usually a QA manager or a traceability lead — and signed by
somebody with the authority to change a process, because half the plan describes things
other departments do.

Three signatures are worth collecting even though none is mandatory: quality, because it
owns the document; operations, because it owns the events being described; and IT or
whoever owns the systems the records live in, because the 24-hour retrieval depends on
them. A plan signed only by quality tends to describe the process quality wishes existed.

Set a review cadence and put it in the document. Annually is the usual interval, with an
out-of-cycle review when you add a listed product, change a lot code format, move records
to a new system, or take on a customer with its own traceability specification.

## Three worked examples

The same six sections read very differently depending on the operation. Three sketches:

### A fresh-cut processor

The processor receives listed raw commodities, transforms them, and ships finished cases.
All three of the common critical tracking events are in play, and transformation is the
one that carries the risk.

The recordkeeping section names the ERP module that holds goods receipt, the production
execution system that records batch inputs and outputs, and the warehouse system that
records despatch, and says how the three are joined. The lot code section describes the
format assigned at transformation and the point on the line where the label is applied.
The covered-foods section points to the SKU determination sheet and names its owner. The
weak point to address explicitly is the repack line: if product can be relabeled without
the original lot travelling, the plan should say how that is prevented.

### A distribution centre

The DC receives and ships and never transforms. It assigns no traceability lot codes at
all, which makes section 3 a short paragraph: lot codes are assigned upstream and carried
through unchanged.

The substance sits in sections 1 and 2. The recordkeeping section has to explain how the
inbound lot code is captured at the door and how it is carried onto the outbound record
— which in most DCs means describing what happens when a pallet is broken down and
cases from several inbound lots end up on one outbound pallet. The covered-foods section
matters more here than anywhere else, because a DC carries thousands of items and the
listed ones have to be flagged in the item master rather than remembered.

### An aquaculture operation

Farmed finfish and shellfish bring in the harvesting and first land-based receiving
events, and the farm map requirement in section 5 applies to the growing areas —
ponds, pens, leases — with their coordinates.

The lot code section describes assignment at first land-based receiving, and the
recordkeeping section has to cover harvest date ranges and harvest locations, which are
recorded differently from a land-based crop. Where product is sold both live and processed,
the plan should state which route each finished form takes, because they generate
different events.

## Where plans fall down

- **The plan describes the intended process, not the current one.** The
usual tell is a system named in the plan that the floor does not use. Walk the plan
against the floor before signing it.

- **Section 2 has no document behind it.** “We identify covered foods
during product development” is a sentence, not a determination. The section should
point to a file with one line per item.

- **The point of contact is a department.** The rule asks for a person. A
shared mailbox is not a person, and the request that arrives on a Friday afternoon needs
somebody to open it.

- **No version history.** Records are kept for two years and so are
superseded plan versions. A plan with no version block cannot show what it said when the
records were created.

- **Nothing about retrieval.** The rule does not require the plan to
describe how you would answer a 24-hour request, but investigators ask, and a plan that
answers the question before it is asked changes the tone of the visit.

## Download the traceability plan template

An editable Word document with the six sections laid out, the prompts for each one, a
covered-product determination table, a version control block, and worked example text for
a processor, a distribution centre and an aquaculture operation. Replace the bracketed
text and it becomes your plan.

### Get the template

One email, and it downloads immediately.

## Frequently asked questions

**Does the traceability plan have to be a separate document?**

It has to be written and it has to contain the required elements.
It can live inside a wider food safety manual as long as the required content is there
and can be produced on request. Most plants keep it separate because it is asked for on
its own and because it has its own version history.

**How long does the plan have to be?**

There is no prescribed length. Four to eight pages covers most
single-site operations. What matters is that each required element is addressed
specifically enough that somebody who does not work at your plant could follow it.

**Do I need a farm map if I am not a farm?**

No. The farm map requirement applies to farms growing or raising
listed foods. A processor, distributor or retailer does not need one. If you operate
both a farm and a plant, the map covers the growing areas.

**How long do I keep superseded versions of the plan?**

Two years, the same retention period as the records themselves.
That is what makes a version control block worth including from the first draft rather
than added later.

**Does the plan need to be signed?**

The rule does not require a signature. A dated approval by
somebody with authority over the processes described is good practice, because most of
the plan commits departments other than quality to do something.

**How often should the plan be reviewed?**

Annually as a baseline, plus an out-of-cycle review whenever you
add a listed product, change how lot codes are assigned, move records to a new system,
or take on a customer with its own traceability specification.

Request a Traceability Readiness Review

A 45-minute working session with an industrial traceability engineer: where your
records stand today, what the 24-hour test would look like at your plant, and the
shortest path to audit-ready.

[Request the review](https://www.fsma.us.com/readiness-review/?from=plan)

**Sources.**
[21 CFR Part 1, Subpart S](https://www.ecfr.gov/current/title-21/chapter-I/subchapter-A/part-1/subpart-S) ·
[FDA: Food Traceability Final Rule](https://www.fda.gov/food/food-safety-modernization-act-fsma/fsma-final-rule-requirements-additional-traceability-records-certain-foods).
The template is a drafting aid, not a compliance guarantee. Last reviewed September 2026.

---

FSMA 204 Resource Center is an independent industry publication. It is not affiliated with, or endorsed by, the U.S. Food and Drug Administration. Content is for general information only and does not constitute legal or regulatory advice.

Canonical page: https://www.fsma.us.com/traceability-plan/
