The 24-Hour Test: What Happens When the FDA Calls

The request is short, the clock is real, and the format matters more than most plants expect. A walk through the day the rule is actually testing for.

By the FSMA 204 Resource Center Editorial Team · · 6 min read

Desk with a laptop showing a spreadsheet of lot records

Everything else in the Food Traceability Rule is a recordkeeping requirement. This one is a performance requirement, and it is the reason the rule changes how plants are run rather than how their filing cabinets are organised.

When the FDA asks for traceability records during an outbreak investigation, a recall or another threat to public health, you have 24 hours to provide them, and when the agency asks for the records as an electronic sortable spreadsheet, that is the form you have to provide them in.

What the request looks like

It is not a subpoena and it is not an inspection. In the ordinary case it is an email or a phone call from an investigator who is assembling a picture across many companies at once, and who needs your piece of it quickly enough to be useful.

The scope is usually narrow and specific: one commodity, one date range, sometimes one lot code that came from a company upstream of you. The question behind it is always the same two-directional one. What did you receive, and where did it go.

The time pressure is real for a reason that is easy to lose sight of behind the compliance framing. While the traceback is incomplete, the public health response has to assume the worst, which means advisories cover more product and recalls cover more companies than they need to. The 24 hours exists to shrink that window.

The two words that decide whether you pass

Electronic rules out a binder and rules out a fax. That part is rarely the problem.

Sortable is the one that catches plants out. A sortable file is one the reviewer can filter and sort: one row per event, with the lot code, dates, quantities, locations and reference documents in their own columns. A folder of scanned delivery notes is electronic. Thirty photographs of pallet labels in an email thread are electronic. A PDF export of a production report is electronic. None of them are sortable, because none of them can be joined to anything without somebody retyping them.

The test to apply to your own output is simple: could a reviewer who has never seen your plant filter your file by lot code and read the chain without asking you a question? If the answer requires a covering email explaining how to read it, it is not there yet.

Where the 24 hours actually goes

Plants that have run the drill tend to report the same distribution of time, and it is not the one they expected.

A typical first attempt, by elapsed time
StepWhat it costs
Working out who owns the responseHours, and sometimes most of a day if the request lands on a Friday
Pulling receiving records for the lotFast, if the lot code is in the system at all
Finding which batches consumed itThe longest single step in almost every plant
Finding where the outputs shippedFast, once the output lot codes are known
Assembling one file from several systemsSlow, manual, and the step most likely to introduce errors

Two of those five are organisational rather than technical. The first — who owns it — is solved by naming a person and a deputy in the traceability plan and telling the switchboard and the shared mailbox where to send it. That fix costs nothing and routinely saves a quarter of the available time.

How to rehearse it

Pick a lot that shipped four to six weeks ago, so the records are cold rather than fresh in somebody’s memory. Give the team the same information a real request would carry: a commodity, a date range, a lot code. Start a clock.

Then watch for three things. Where does the work stall. Who has to be interrupted for it to continue. And what does the final file look like — is it one sheet, or is it an email with four attachments and an explanation.

Record the elapsed time. Run it again in six months and compare. That pair of numbers is more persuasive with a management team than any gap analysis, because it is a measurement of the plant rather than an opinion about it.

What a good answer looks like

One file. One row per event. Columns for the event type, the traceability lot code, the product description, the quantity and unit, the locations, the date and the reference document. Receiving rows, transformation rows and shipping rows in the same sheet, tied by the lot codes.

Plants that can produce that in an afternoon have almost always done two specific things: they put receiving, production and despatch records somewhere they can be queried together, and they built the export before they needed it.

Test your own position

Four of the fourteen questions in the Readiness Self-Assessment cover exactly this: where the records live, whether the export exists, and when it was last run against a clock. Take the assessment →